SikaCor® EG-5
2-pack AY-PUR top coat
SikaCor® EG-5 is a 2-pack acrylic polyurethane top coat. By adding 1 % b.w. SikaCor® PUR Accelerator (see product data sheet for more information) a fast touch and through drying will be achieved.
- Very good corrosion protection properties
- Excellent chemical, weather and colour stability
- Tough elastic and hard but not brittle
- Largely insensitive against shock and impact
Usage
In combination with 2-pack primer and intermediate coats of the SikaCor® and Sika® Permacor® product range for heavy duty corrosion protection of atmospheric exposed and submerged steel structures. SikaCor® EG-5 can also be used as a line marking paint on selflevelling and broadcasted epoxy and polyurethan resin based floors.Advantages
Combined with 2-pack epoxy primer and intermediate coats:- Very good corrosion protection properties
- Excellent chemical, weather and colour stability
- Tough elastic and hard but not brittle
- Largely insensitive against shock and impact
Packaging
SikaCor® EG-5 | 30 kg |
Sika® Thinner EG | 25 L, 10 L and 3 L |
Colour
Grey, other colour shades on request.
Product Details
APPROVALS / STANDARDS
- Approved according to German standard ‘TL/TP-KOR-Stahlbauten’, page 87 and page 94.
- In combination with SikaCor® PUR Accelerator, SikaCor® EG-5 is approved according to German standard ‘TL/TP-KOR-Stahlbauten’, page 97.
Shelf Life
2 years
Storage Conditions
In originally sealed containers in a cool and dry environment.
Density
~ 1.3 kg/l
Solid Content
~ 61 % by volume
~ 74 % by weight
Chemical Resistance
Weather, water, sewage, seawater, smoke, de-icing salts, acid and lye vapours, oils, grease and short term exposure to fuels and solvents.
Thermal Resistance
Dry heat up to +150 °C, short term up to +180 °C Damp heat up to approx. +50 °C In case of higher temperatures please consult Sika.
Application
Mixing Ratio
Components A : B |
By weight | 90 : 10 |
By volume | 7.1 : 1 |
Thinner
Sika® Thinner EG If necessary max. 5 % Sika® Thinner EG may be added to adapt the viscosity.
Product Temperature
Min. + 5°C
Relative Air Humidity
Max. 85 %, except the surface temperature is significantly higher than the dew point temperature, it shall be at least 3 K above dew point.
The surface must be dry and free from ice.
Surface Temperature
Min. + 5°C 0°C by adding SikaCor® PUR Accelerator
Pot Life
At + 10°C | ~ 7 h | ~ 5 h * |
At + 20°C | ~ 5 h | ~ 3 h * |
At + 30°C | ~ 4 h | ~ 2 h * |
* By adding 1 % b.w. SikaCor® PUR Accelerator
Drying Stage 6
Dry film thickness 80 μm | |
+5 °C after | 21 h |
+10 °C after | 18 h |
+20 °C after | 14 h |
+40 °C after | 3 h |
+80 °C after | 45 min |
By adding 1 % b.w. SikaCor® PUR Accelerator:
Dry film thickness 80 μm | |
0 °C after | 52 h |
+ 5 °C after | 18 h |
+ 10 °C after | 13 h |
+ 20 °C after | 5 h |
Waiting Time / Overcoating
Min. until drying stage 6 is achieved
Max. unlimited
Prior to further applications possible contamination must be removed.
Drying Time
Final drying time Depending on film thickness and temperature full hardness is achieved after 1–2 weeks. Tests of the completed coating system should only be carried out after final curing.
Consumption
Theoretical material-consumption/VOC without loss for medium dry film thickness:
Dry film thickness | 60 μm | 80 μm |
Wet film thickness | 100 μm | 130 μm |
Consumption | ~ 0.130 kg/m2 | ~ 0.170 kg/m2 |
VOC | ~ 33.2 g/m2 | ~ 44.3 g/m2 |
SURFACE PREPARATION
Steel: Blast cleaning to Sa 2 ½ according to ISO 12944-4. Free from dirt, oil and grease. Hot dip galvanized steel, stainless steel and aluminium: Free from dirt, oil, grease and corrosion products. In case of permanent immersion and condensation the surfaces must be slightly sweep blasted with non-ferrous abrasives. For contaminated surfaces e.g. galvanized or primed areas we recommend to clean with SikaCor® Wash.
MIXING
Stir component A very thoroughly using an electric mixer (start slowly, then increase up to approx. 300 rpm). Add component B carefully and mix both components very thoroughly (including sides and bottom of the container). Mix for at least 3 minutes until a homogeneous mixture is achieved. Fill mixed material into clean container and mix again shortly as described above. During mixing and handling of the materials always wear protective goggles, suitable gloves and other protective clothings.
APPLICATION
The method of application has a major effect on achieving uniform thickness and appearance. Spray application will give the best results. The indicated dry film thickness is easily achieved by airless spray. Adding solvents reduces the sag resistance and the dry film thickness. In case of application by roller or brush, additional applications may become necessary to achieve the required coating thickness, depending on type of construction, site conditions, colour shade etc. Prior to major coating operations a test application on site may be useful to ensure the selected application method will provide the requested results.
By brush and roller Conventional high pressure spraying:
- Nozzle size 1.5–2.5 mm
- Pressure 3–5 bar
- Oil and water trap is compulsory
Airless-spraying:
- Pressure min. 180 bar
- Nozzle size 0.38–0.53 mm (0.015–0.021 inch)
- Spraying angle 40°–80°
CLEANING OF TOOLS
SikaCor® Cleaner
Spraying equipment must be rinsed with Sika® Thinner EG before using SikaCor® EG-5.