2020
North Point, Hong Kong
Project Requirement
The concrete floor should be high performance, high early and ultimate
strength to receive heavy traffic in early day. The coating should be
decorative and durable to protect the floor from dirt and chemical attack.
Project Area
200 m²
Sika Solution
Monoset® HPC
Sikadur®-31 CF
Sikafloor®-156
Sikafloor®-264